Log in

Login to your account

Username *
Password *
Remember Me

About Becht Training

ASME Section VIII, Division 2 - Part 5, Design-By-Analysis #28967 - Houston, TX

From Monday, November 09, 2020 -  08:00am
To Friday, November 13, 2020 - 04:30pm
Hits : 19
Contact Becht Technical Training: 908-580-1119

Early Bird Pricing available until Friday, October 23!

 Virtual Attendance Available Contact Becht Technical Training

Course Venue - Becht Engineering Houston Office, Houston, TX
Course Fee - US$2,400 US$2,160

Becht's 4 day Design-By-Analysis course will introduce participants to the Design-By-Analysis portion of the ASME code Section VIII, Division 2, Part 5. Based on the rules and guidance provided in Part 5, this course is a comprehensive introduction to the requirements of performing Design-By-Analysis to the ASME Code. This course provides detailed instruction on performing finite element analysis in compliance with the Code. Examples problems are presented and discussed for many of the common rules. This course is intended for engineers who are familiar with pressure vessel and piping design, and need additional guidance on applying Design-By-Analysis concepts.

Who Should Attend? This course is intended for engineers who are familiar with pressure vessel and piping design, and need additional guidance on applying Design-By-Analysis concepts.  It is also intended for engineers who specify and review Design-By-Analysis work by others.  Experience in using finite element analysis will be helpful, but is not necessary.

Key Topics covered include:

  1. General Philosophy: Protection Against Failure Modes
  2. Load Conditions and Load Case Combinations
  3. Protection Against Plastic Collapse
    • Elastic Analysis
      • Linearization of Stress Results for Stress Classification
    • Limit Analysis
    • Elastic-Plastic Analysis
      • Elastic-Plastic Stress-Strain Curve Development
  4. Protecxtion Against Local Failure
  5. Protection Against Collapse from Buckling
  6. Protection Against Failure from Cyclic Loading: Ratcheting
    • Elastic Analysis
    • Elastic-Plastic Analysis
  7. Protection Against Failure from Cyclic Loading: Fatigue
    • Screening for exemption from fatigue analysis
    • Elastic Fatigure Analysis
    • Elastic-Plastic Fatigue Analysis
  8. Protection Against Failure from Cyclic Loading: Fatigue of Weldments
    • Fatigue Strength Reduction Factor
    • Structural Stress Method
  9. Histogram Developments and Cycle Counting for Fatigue Analysis
  10. Introduction to Part 4 - Design By Rules
  11. FEA and Reports Discussion, including Compliance with AB-520

 Upon completion of this course, you will receive a certificate for attending 24 hours of professional development.

 

 Instructor:

seipp2012
Trevor Seipp, P.Eng., 
Division Manager, Becht Engineering Canada, Ltd.

 

  

 

 

 

 

 

 

 

 

Click to Register and Pay On-line for this or other Becht Courses

Questions? Contact Becht Technical Training: 908-580-1119; Email Training Click Here

 

Location Becht Houston Office - 14200 Gulf Freeway, Suite 100, Houston, Texas 77034

Upcoming Becht Training 2020 Schedule

02Mar
API-579/ASME FFS-1 Fitness for Service with BechtFFS Software #28951 - Webster, TX
Mon Mar 02, 2020 @ 8:00AM - 04:30PM
Hilton Garden Inn Houston/Clear Lake NASA - 750 West Texas Ave., Webster, Texas 77598

09Mar
ASME Section VIII, Division 1 Pressure Vessel Design with Software Application Training Course #28950 - Webster, TX
Mon Mar 09, 2020 @ 8:00AM - 04:30PM
Hilton Garden Inn Houston/Clear Lake NASA - 750 West Texas Ave., Webster, Texas 77598

01Apr
Storage Tank Design and Maintenance (API 650 & API-653) #28953 - Houston, TX
Wed Apr 01, 2020 @ 8:00AM - 04:30PM
Becht Houston Office - 14200 Gulf Freeway, Suite 100, Houston, TX 77034

13Apr
Piping Vibration Analysis & Practical Engineering Solutions in Process Plants #28952 - Webster, TX
Mon Apr 13, 2020 @ 8:00AM - 04:30PM
Hilton Garden Inn Houston/Clear Lake NASA - 750 West Texas Ave., Webster, Texas 77598

27Apr
Implementation of ASME PCC-2 Repair of Pressure Equipment & Piping Through Case Studies #28954 - Webster, TX
Mon Apr 27, 2020 @ 8:00AM - 04:30PM
Hilton Garden Inn Houston/Clear Lake NASA - 750 West Texas Ave., Webster, Texas 77598

18May
ASME Section VIII, Division 2 - Part 5, Design-By-Analysis #28957 - Houston, TX
Mon May 18, 2020 @ 8:00AM - 04:30PM
Becht Engineering Houston Office - 14200 Gulf Freeway, Suite 100, Houston, Texas 77034

01Sep
Heat Exchanger Design with Software Application Training Course #28960 - Houston, TX
Tue Sep 01, 2020 @ 8:00AM - 04:30PM
Becht Engineering Houston Office - 14200 Gulf Freeway, Suite 100, Houston, Texas 77034

08Sep
ASME B31.3, Process Piping - Design, Construction, and Mechanical Integrity #28955 - Houston, TX
Tue Sep 08, 2020 @ 8:00AM - 04:30PM
Becht Engineering Houston Office - 14200 Gulf Freeway, Suite 100, Houston, TX 77034

05Oct
ASME Section VIII, Division 1 Pressure Vessel Design with Software Application Training Course #28964 - Webster, TX
Mon Oct 05, 2020 @ 8:00AM - 04:30PM
Hilton Garden Inn Houston/Clear Lake NASA - 750 West Texas Ave., Webster, Texas 77598

19Oct
API-579/ASME FFS-1 Fitness for Service with BechtFFS Software #28965 - Webster, TX
Mon Oct 19, 2020 @ 8:00AM - 04:30PM
Hilton Garden Inn Houston/Clear Lake NASA - 750 West Texas Ave., Webster, Texas 77598

02Nov
Implementation of ASME PCC-2 Repair of Pressure Equipment & Piping Through Case Studies #28966 - Webster, TX
Mon Nov 02, 2020 @ 8:00AM - 04:30PM
Hilton Garden Inn Houston/Clear Lake NASA - 750 West Texas Ave., Webster, Texas 77598

09Nov
ASME Section VIII, Division 2 - Part 5, Design-By-Analysis #28967 - Houston, TX
Mon Nov 09, 2020 @ 8:00AM - 04:30PM
Becht Houston Office - 14200 Gulf Freeway, Suite 100, Houston, Texas 77034

Becht Nuclear Lunch & Learn

becht nuclear training

Becht Nuclear Services offers free, 1-hour overview sessions on a variety of topics such as:

  • Wall Thinning Corrosion or Erosion in Piping Systems using ASME XI CC N-513 and N-597
  • Operability of Piping Systems using ASME III Div.1 Appendix F
  • Crack-Like Flaws using ASME XI Failure Assessment Diagram
  • Wall Thinning Corrosion or Erosion in Buried Piping Systems using ASME XI CC N-806
  • Plus much, much more...

Each seminar is followed by a question period for participants.

47 georgeablogInstructor:  George Antaki, PE, fellow ASME, is chairman of ASME III Working Group Piping Design, chairman of ASME B31 Mechanical design Committee, and member of ASME O&M Subgroup Piping.  George is the Division Manager for Becht Nuclear and has over 40 years of hands-on experience.

Click for Info

Becht Training Courses

  • All
  • CivilStructural
  • COMPRESS
  • CorrosionMaterials
  • Currently Offered
  • FitnessForService
  • Nuclear
  • Piping
  • PressureVessels
  • Tankage
load more hold SHIFT key to load all load all