Rick Hoffman joined Becht Engineering in June, 2009 as a Senior Engineering Advisor. He has more than 39 years experience in engineering, reliability management and maintenance in the refining, petrochemical and synthetic fuels industries.Prior to joining Becht Engineering he was the Director, Specialty Engineering for LyondellBasell Industries. In... this role he had worldwide responsibility for corporate technical support, mechanical engineering and maintenance for more than 40 chemical plants and two refineries. He was also responsible for capital project support, setting the strategic direction for Lyondell maintenance More

Importance of Codes and Standards for Process Safety

Importance of Codes and Standards for Process Safety
Compliance with the Process Safety Management rule, OSHA 1910.119, is a requirement for plants processing certain highly hazardous materials exceeding threshold quantities. The rule requires the owner to demonstrate all equipment has been purchased and installed in accordance with recognized industry standards. Maintenance practices must also be according to Recognized and Generally Accepted Good Engineering Practice (RAGAGEP) . The owner must document this information as part of the Process Safety Information and Mechanical Integrity program for the plant. Use of Codes The use of codes and standards can help assure compliance with the rule. For example ASME Section VIII is the recognized code for construction of pressure vessels operating in the United States at pressures over 15 psi. It would be difficult to debate vessels could be designed and built to other requirements and still be acceptable under the PSM rule. Codes such as the ASME code have been developed and...
Continue reading
11
  3518 Hits
  0 Comments
3518 Hits
0 Comments

PSM Implementation is a Challenge -- Maintaining Compliance is Even Harder

PSM Implementation is a Challenge -- 
Maintaining Compliance is Even Harder
The Process Safety Management rule (PSM), OSHA 1910.119, was implemented in the early 90’s, more than 20 years ago. Implementation was driven by a number of tragic accidents in the process industry. However, despite the long history of the rule and multiple preventable, catastrophic incidents, many companies still have not fully implemented PSM. Companies that have implemented the PSM rule often find it very challenging to maintain compliance.  Becht Engineering has conducted numerous PSM, due diligence and mechanical integrity audits and discovered deficiencies in PSM compliance. We have even discovered major gaps in some facilities that have done well during OSHA audits. These plants were generally located where there are limited numbers of hydrocarbon and chemical processing facilities. OSHA simply lacked the local resources and skills to perform adequate audits. These plants can be highly vulnerable to both incidents and fines since they may assume everything is in compliance. In the...
Continue reading
4
  1640 Hits
  0 Comments
1640 Hits
0 Comments

Expert Witness - A Becht Engineering Service to Avoid

Expert Witness - A Becht Engineering Service to Avoid
Becht Engineering personnel have significant experience in serving as Expert Witnesses for a variety of legal matters.   However, litigation can be costly, time consuming and often times the outcome is unpredictable.    It should be avoided if at all possible through implementation of proper controls and oversight. A much better strategy than after the fact litigation is to put contracts, systems, specifications and personnel in place to assure there is a good outcome on a project.  This will also assure that issues are addressed in timely fashion and resolved quickly.  Several years ago I wrote a paper titled “ The Top 10 Myths of Reliability Management. ” The first myth was “You can always trust your contractor.” While many contractors are quite competent, it is important to have a clear understanding of the expectations and the contactor must be monitored to assure the work is going according to plan.  Becht Engineering...
Continue reading
2
  1627 Hits
  0 Comments
1627 Hits
0 Comments

Due Diligence -- Pay a Little, Save a Lot

Due Diligence -- Pay a Little, Save a Lot
  Acquiring a Petrochemical Plant, Refinery or Other Major Asset? It’s always important to have expert advice when you buy anything -- from a new car to a wide screen television.  Normally, there are many sources of information to determine which products provide the best value, reliability and that will last.   However what do you do if you are investing in a petrochemical plant or refinery or other major industrial plant? Certainly, there are no publications rating the integrity of the plant or forecasting operations subsequent to acquisition.  This is where Becht Due Diligence can be an important tool to assess future performance of an asset.   Becht Due Diligence is a structured process where an expert team using a flexible protocol provides a detailed evaluation of an asset.   Becht Engineering personnel have extensive experience in conducting due diligence assessments -- our people have led or comprised teams for over 20 Due...
Continue reading
2
  3731 Hits
  0 Comments
3731 Hits
0 Comments