Becht default post image

Measuring Pressure Pulsation in Piping Systems

It is normal for piping systems to exhibit steady pressure pulses. Most of the time these pulses are inconsequential; however, in a few cases they must be eliminated because they can affect the reliable operation of the system or they can cause a mechanical failure. Becht Engineering recently assisted a client in the evaluation of […]

Continue Reading
Becht default post image

Protection of Nuclear Power Plants from Tornado Missiles

Road Map of Regulatory Requirements General Design Criteria – The protection of nuclear power plants from the effects of tornadoes (or extreme winds from typhoons or hurricanes, depending on the locality) is required through 10CFR50 Appendix A, 10 CFR 50, Appendix A, General Design Criterion 2 which requires that structures, systems, and components (SSCs) important […]

Continue Reading
Becht default post image

Post-Fukushima: The Concept of Beyond Design Basis Earthquakes

Immediately following the Fukushima accident of March 11, 2011, the US Nuclear Regulatory Commission assembled a Near-Term Task Force to gather the lessons learned from the Fukushima Dai-Ichi accident. The Task Force compiled a set of “Recommendations for Enhancing Reactor Safety in the 21st Century.” The Recommendations were approved by the Commissioner and issued for […]

Continue Reading

Fitness-for-Service of Damaged Buried Pipe — What Code Case N-806 Is and Is Not

This article outlines the procedure to evaluate the fitness-for-service of corroded buried pipe, and explains what CC N-806 covers … and what it does not cover. What are the Damage Mechanisms in Metallic Buried Pipe? The inspection of a buried metallic pipe, after years of service, can reveal that the pipe has little if any […]

Continue Reading

An Integrated Approach to Limit the Effects of Water Hammer on Piping Systems

This article describes an integrated study of thermal-hydraulic and structural loading of bounding piping systems, to establish an operating envelope, screening criteria, and rules of good design practice to protect piping systems from damage caused by valve closure water hammer.  Introduction In many cases of operation or flushing of piping system, it is necessary to […]

Continue Reading
Becht default post image

Explosive Failure of Vessels

FAILURE MODE – When an explosion (either a subsonic deflagration, or a supersonic detonation) occurs in a metallic vessel, one of three things can happen: Case 1 – Containment: The vessel can contain the explosion, elastically as if nothing happened, or with plastic bulging. Case 2 – Rupture: The vessel can rupture, without ejecting fragments. […]

Continue Reading
Becht default post image

Elevated Temperature Reactor Component Design and Qualification

  Becht Engineering, Nuclear Services Division, has completed a finite-element numerical study of two proposed Code Cases for ASME III Division 1 Subsection NH, Class 1 Components in Elevated Temperature Service.  They are: “Satisfaction of Strain limits for Class 1 Components at Elevated Temperature Service Using Elastic-Perfectly Plastic Analysis” and “Calculation of Creep-Fatigue for Class […]

Continue Reading
Becht default post image

NonMetallic Composite Wrap Pipe Repair

Nonmetallic composite wrap repairs are wraps comprising two constituents: A fabric woven from a fiber such as graphite or glass A thermoset polymer such as a two-component mix epoxy resin. This material is also referred to as fiber-reinforced polymer (FRP). These repairs can be liners wrapped inside, or jackets wrapped over a corroded pipe. There […]

Continue Reading
Becht default post image

Inspection Planner Position Helps Lead to Turnaround Success

Providing “Best in Class” risk based fixed equipment turnaround inspection planning entails a four phase workflow process to scope, plan, execute and evergreen inspection plans to cost effectively mitigate a client’s regulatory and business risk. Becht Engineering has successfully completed piloting  the, “Inspection Planners Position” to bridge gaps inherent in developing and executing inspection plans […]

Continue Reading
Let Becht Turn Your Problem
Into Peace of Mind