Log in

Login to your account

Username *
Password *
Remember Me

Becht Engineering Blog

In this section of the site contributing authors submit interesting articles relating to the various services, industries and research & development efforts of Becht Engineering.

12 Checks When Qualifying Piping Systems in Nuclear Applications

becht_nuclear_12_checks
The analysis and qualification of piping systems in nuclear power plants involves more than meeting Code stress limits. Generally, a piping system is qualified if the following criteria have been met. These various qualification criteria are typically specified in the plant FSAR, the plant design procedures, or the ASME Code.Pressure design in accordance with the design Code. This check will govern the schedule of pipes, the thickness of tubing, the schedule and pressure class of fittings, the reinforcement of openings and branch connections, the pressure rating of valves, the pressure class of flanges, and the pressure design of specialty fittings.ASME Code stress limits. This check will verify that the Code stress equations for the load combinations corresponding to Test, Design, and Service Levels A, B, C, and D loadings have been met.NRC Standard Review Plan (SRP) Section 3.6 stress limits for the postulation of high energy line breaks. This check will...
Continue reading
6
  2294 Hits
  0 Comments
2294 Hits
0 Comments

Subscribe To Becht Blogs

Search Blogs