Log in

Login to your account

Username *
Password *
Remember Me

Becht Engineering Blog

In this section of the site contributing authors submit interesting articles relating to the various services, industries and research & development efforts of Becht Engineering.

Rick Hoffman joined Becht Engineering in June, 2009 as a Senior Engineering Advisor. He has more than 39 years experience in engineering, reliability management and maintenance in the refining, petrochemical and synthetic fuels industries.

Prior to joining Becht Engineering he was the Director, Specialty Engineering for LyondellBasell Industries. In this role he had worldwide responsibility for corporate technical support, mechanical engineering and maintenance for more than 40 chemical plants and two refineries. He was also responsible for capital project support, setting the strategic direction for Lyondell maintenance

Reliability Program Implementation and High Altitude Climbing - What They Have in Common

mt-everest
This is the third in a series of Blogs on improving plant reliability performance through changes in culture, programs, equipment design, maintenance and operation.   [Click link to review   Making Bad Actor Elimination Programs Work ; or the second blog, Reliability Beliefs - Driving Organizational Accountability ]    This blog compares experiences in successful high-altitude expedition climbing and the effort to implement a true world-class reliability program in your plant.  The similarities of implementing a strong reliability program and climbing a big mountain became apparent a number of years ago during the planning stages for a climb on Kilimanjaro.   This peak is the highest point in Africa and one of the “Seven Summits” or highest points on the seven continents.   From an altitude standpoint, Kilimanjaro at 19,340 feet is in the middle of the pack with 3 summits higher and 3 that are lower than “Kili.” Although Kilimanjaro is a walk up, it...
Continue reading
Rate this blog entry:
0
32 Hits
0 Comments

Reliability Beliefs - Driving Organizational Accountability

Becht-reliability_leaks_investment
This is the second in a series of Blogs on improving plant reliability performance through improvement in culture, programs and equipment design, maintenance and operation.  This Blog focuses on Reliability Beliefs - a key element in organizational accountability for everyone to do the right thing every time .  Read the first blog in the series - Eliminating Bad Actors (click)   Reliability Beliefs are a set of statements that establish the culture of an organization.  In highly reliable plants, each employee, contractor and vendor subscribe to the beliefs.  It is not enough to discuss beliefs or post them on bulletin boards or in control rooms.  These beliefs must be embedded into the culture of the organization and can be recited by employees and outside service providers.  They represent how employees at all levels behave when working at a plant or in a corporate role. History I spent many years of...
Continue reading
Rate this blog entry:
2
325 Hits
0 Comments

Hurricane Harvey Recovery - Methodical Steps to Restart Your Plant

hurricane_Harvey_weather_image
I personally went through Hurricane Rita and Hurricane Ike during my career living in the Gulf Coast. Restarting our plants after these storms was challenging, home life was miserable without power for three weeks and traveling over 100 miles north to find gasoline, food and water for family and neighbors was time consuming and hazardous. However, this experience pales in comparison to the challenges faced by families and operating companies from Houston to Corpus Christ and beyond recovering from the unprecedented events cause by Hurricane Harvey. In this posting, I identify the challenges faced with our employees and plants as we restarted after these storms. Becht hopes this blog will help you and your companies through these trying times. Many of the personnel at Becht Engineering have been through hurricane recovery , plant restarts and emergency situations. Please contact us if we can help. These important points must be considered...
Continue reading
Rate this blog entry:
3
189 Hits
0 Comments

Making Bad Actor Elimination Programs Work

bad_actor_removal-Becht
This is the first in a series of Blogs on improving plant reliability programs through improvements in culture, programs and equipment performance.  This Blog focuses on Bad Actor Elimination . The second part in this series is titled Reliability Beliefs - Driving Organizational Accountability (click) Most plants have many pieces of equipment that are chronic problems.  In some operations machinery can be the leading cause of outage while in others solids handling equipment, aggressive corrosion, erosion of parts or power failures are the issue.  Problems can also be traced back to lack of procedures, poor employee morale or lack of training.  These problems impact profitability due to frequency of outage, cost of repairs and cost of lost production.    ...studies have shown the cost of unplanned and emergency work is about four times the cost of planned work... Many studies have shown the cost of unplanned and emergency work is...
Continue reading
Rate this blog entry:
1
527 Hits
0 Comments

Search Blogs

Subscribe or View Newsletters

newsletters

Click Here

Subscribe to our newsletters

or Click Link to View Archives