Process Safety Management and YOU

becht_process_safety_management
Walking the Walk…Management Commitment My assumption is if you are reading this, you have some involvement in, or responsibility for, Process Safety Management (PSM) in your facility.  OSHA’s Standard for Hazardous Materials, 29 CFR 1910.119, is a mere 21 pages long including 12 pages of “non-mandatory” appendices -- but should it be your responsibility, what a daunting task to implement!  I remember Otter from the movie Animal House being quoted when everything looked so bleak - “Now we could do it with conventional weapons, but that would take years and cost millions of lives.  No, I think we have to go all out.  I think that this situation absolutely requires a really futile and stupid gesture to be done on somebody’s part!” What to do? You could immediately start looking elsewhere for employment, focus on the daily emergencies that will always be there and hope your boss values crisis management more...
Continue reading
Rate this blog entry:
2
339 Hits
0 Comments

Importance of Codes and Standards for Process Safety

Importance of Codes and Standards for Process Safety
Compliance with the Process Safety Management rule, OSHA 1910.119, is a requirement for plants processing certain highly hazardous materials exceeding threshold quantities. The rule requires the owner to demonstrate all equipment has been purchased and installed in accordance with recognized industry standards. Maintenance practices must also be according to Recognized and Generally Accepted Good Engineering Practice (RAGAGEP) . The owner must document this information as part of the Process Safety Information and Mechanical Integrity program for the plant. Use of Codes The use of codes and standards can help assure compliance with the rule. For example ASME Section VIII is the recognized code for construction of pressure vessels operating in the United States at pressures over 15 psi. It would be difficult to debate vessels could be designed and built to other requirements and still be acceptable under the PSM rule. Codes such as the ASME code have been developed...
Continue reading
Rate this blog entry:
10
1853 Hits
0 Comments

PSM Implementation is a Challenge -- Maintaining Compliance is Even Harder

PSM Implementation is a Challenge -- 
Maintaining Compliance is Even Harder
The Process Safety Management rule (PSM), OSHA 1910.119, was implemented in the early 90’s, more than 20 years ago. Implementation was driven by a number of tragic accidents in the process industry. However, despite the long history of the rule and multiple preventable, catastrophic incidents, many companies still have not fully implemented PSM. Companies that have implemented the PSM rule often find it very challenging to maintain compliance.  Becht Engineering has conducted numerous PSM, due diligence and mechanical integrity audits and discovered deficiencies in PSM compliance. We have even discovered major gaps in some facilities that have done well during OSHA audits. These plants were generally located where there are limited numbers of hydrocarbon and chemical processing facilities. OSHA simply lacked the local resources and skills to perform adequate audits. These plants can be highly vulnerable to both incidents and fines since they may assume everything is in compliance. In...
Continue reading
Rate this blog entry:
3
1069 Hits
0 Comments

Safety - Plan, Promote and Participate: A Simple Recipe For Success

Safety - Plan, Promote and Participate:  A Simple Recipe For Success
  As the year draws to a close, I’ve been retrospective --  regarding what I have seen in terms of Safety successes.   It turns out that it has been a good year for Safety! Having had the opportunity to interact with different operations, companies and a variety of “Safety Cultures”, it is evident to me why some are more successful than others.  Once I considered the successes a trend became evident.  While considering to giving this trend a snazzy title, I decided to just call it the 3 P’s:  Plan, Promote, Participate - Simple yet appropriate.  Let me use an existing project to demonstrate the principle of the 3. Becht Engineering has been involved with a project at an existing refinery for about a year.  This project is a process upgrade with a planned duration of approximately 18 months.  Peak headcount will be about 150 craft workers spread amongst  a...
Continue reading
Rate this blog entry:
0
1854 Hits
0 Comments

Search Blogs

Blog Tags

Piping Pressure Vessel ASME Code Nuclear Equipment Strategies Reliability Fitness-for-Service Rotating Equipment Safety Turnaround Vibration Corrosion Materials Heavy Lift Aging Equipment Leadership Finite Element Inspection Rigging Planning Software Cranes Motors Pumps Compressors Seals RBWS Process PSM OSHA Due Diligence RBI Metallurgy Beyond-Design-Basis Events Seismic Qualification Brittle Fracture OSHA 1910.119 Modelling Dimensional Control Ultrasonic Testing Tanks Coke Drums Design FEA FSI Valves Expert Witnesses API 579 Simulations Hazardous Materials Testimony Projects Lift Manual 3D Printing ASME FFS-1 Bearings Legal Process Safety Management rule Geotechnical CAD Asset Integration ASME B31.3 Pipe Supports Hurricane Harvey Gap Analysis Buckling Plant Life Extension process industry Machinery Buried pipe Front End Loading process team Control Systems Filters Reliability Beliefs ISRS Turn Around LOCA Plant Re-start PCC-2 Bad Actor R &D PLC Management ANSYS Minimum Allowable Temperature Nuclear Power Plant DMR ASME XI Root Cause Analysis technology review DCS Operational Excellence Regulations NUREG-0609 California ASME III Div. I Maintenance Management process development Trips Equations Nozzles Fired Equipment RCA process design Becht Engineering personnel NRC Fatigue NRC Inspection Manual ASTM CFD Heat Transfer Process Safety Refining experience NB-3650 Corrosive Environment Appendix F Training OSHA 29 CFR 1910.119 Separation Integrity Blowers Stress Equations Laser Scanning

Subscribe or View Newsletters

newsletters

Click Here

Subscribe to our newsletters

or Click Link to View Archives