Becht Engineering Blog

In this section of the site contributing authors submit interesting articles relating to the various services, industries and research & development efforts of Becht Engineering.

Becht Dimensional Technology Mitigates Potential Problems In Heavy Lifts

dimensional_control_w_heavy_lift
Written by Joe Collins & Derek Paterson Safety and precision are of the utmost importance of any heavy lift operation. Heavy Lift Field Advisors are tasked with measuring clearances to assure the load will clear obstructions, a step often done by hand with a tape measure. Moreover, Field Advisors are also charged with assuring the location of the crane matches the plan. It is critical that the crane is on the precise radius for the capacity charts to be valid – too far away and the crane will not have sufficient capacity to handle the load; too close and crane can’t boom up high enough to place the load. Again, these verifications are often done by hand with tape measure. In this article, we talk about specific heavy lift problems that could have been avoided by integrating Dimensional Control with the projects. So - What can happen without precise measurement?...
Continue reading
2
  566 Hits
  0 Comments
566 Hits
0 Comments

Elements of a Super Heavy Lift Execution Manual

becht_heavy_lift_manual
Making A Super Heavy Lift?  Here's What You Need To Know If you are making a single super lift or a series of super lifts there will be a tremendous number of documents created during the planning stages.  In addition to the original documents there will be numerous revisions as the fine tuning of the details are realized.  The document control of the process can be overwhelming - but is critical for success.  Ultimately, there is a risk that the field crews may not possess the most current revision when they attempt the lift.  That omission could end in disaster.  There is no one definition for a "Super Lift" in any current standard.  However, many companies performing extreme lifts within their facilities have coined the term and created their own definitions.  The goal is to minimize risk by requiring a comprehensive engineered lift plan followed by a third-party review of...
Continue reading
5
  1887 Hits
  0 Comments
1887 Hits
0 Comments

Mecca Crane Collapse -- "The worst crane accident in living memory"

Mecca Crane Collapse -- "The worst crane accident in living memory"
I am sure most of you heard about the tragic crane accident that occurred in Mecca in September 2015. I was paying very close attention as the crane was very large and similar to the cranes we work with everyday here at Becht. We have utilized the same make and model on three projects just this year! The following is my understanding of the events, according to various articles and news reports. Background A Liebherr LR 11350 crawler crane with 600 feet of boom and jib was set up just outside Masjid al-Haram, the largest mosque in the world in the city of Mecca.  There were storms in the region over the preceding week. Due to expected crowds, the Governor of Mecca ordered the crane to be moved away from public areas, thereby eliminating any hazard posed by the extremely tall crane. The contractor and crane owner is the Binladin...
Continue reading
6
  5033 Hits
  4 Comments
5033 Hits
4 Comments

Crane Operator Certification - OSHA Rule 1926.1427

Crane Operator Certification - OSHA Rule 1926.1427
I have been receiving many inquiries recently from individuals and companies concerned about the status of OSHA Rule 1926.1427 – All wondering if they are in compliance. Bottom Line - There is currently a nationwide controversy regarding  OSHA regulation on crane operators . Background OSHA enacted a new crane rule in 2010.  The part 1926.1427 (Crane Operators) has been retracted and is not being enforced.  Part 1427 states that all crane operators shall be certified by Crane Type and Capacity .  The certifying agencies either (1) are not able to provide this service or (2) are struggling with the directive.  To provide the service as stated, they would need to develop a test for every type and size of crane used in the USA.  Furthermore, the practical testing would require unlimited access to all those cranes. Industry has formally protested this rule.  Although OSHA has not agreed to change it,...
Continue reading
4
  3304 Hits
  3 Comments
3304 Hits
3 Comments