RBWS Program Implementation

RBWS Program Implementation

RBWS Implementation Image

Becht’s team of Reliability Specialists rolled out a risk-based work selection (RBWS) program at a number of refineries for a major Refining Company. Becht’s methodology utilizes RBWS, which is an industry Best Practice for Turnaround Work Scope development. Our RBWS methodology utilizes Becht’s proprietary STRAITS© software to enable risk-based decision making in equipment operations, inspection and maintenance.

RBWS Implementation ImageThe user-friendly Becht tool, STRAITS©, integrates the RBWS process and was optimized to be used in a group setting to facilitate. The software, which has an embedded S/H/E and financial risk-calculator, was delivered along with supporting documentation and training.

Our expert facilitators worked with plant personnel engaged in TA Work Scope development. A comprehensive assessment of the Work List was done to assess the drivers (Process or Equipment Integrity) for TA work. A structured risk-based process, using Becht’s software, was used to challenge the work list items and determine whether the TA work is justifiable, or whether deferments are permissible. For TAs, requiring 200,000 to 1,000,000 mhrs, the Becht process identified potential savings of 15-30% on estimated Direct Costs for the planned work scope.

To receive more information on any of this software and download a demo
CLICK HERE

Contact
|
Let Becht Turn Your Problem
Into Peace of Mind