Case Study – Remote Piping System Inspection Situation: A new steam turbine generator installation in the Middle East was suffering significan... Read More
Process Design – Oxidation Overhead Condenser Redesign Situation: Client's Oxidation Overhead Condenser suffered tube leaks attributed to fretting and tub... Read More
Remote Piping System Inspection Situation: A new steam turbine generator installation in the Middle East was suffering significant... Read More
IPP Combined Cycle Risk Assessment Situation: A large 300 MW Combined Cycle Generating Plant was experiencing an increasing frequency... Read More
Midstream Debottlenecking – Optimization of Investment Situation: A pipeline and storage network debottlenecking assessment and variance reporting was requ... Read More
Midstream Due Diligence – Optimization of Investment Situation: A global financial group considering a major equity investment in a North American midst... Read More
Midstream Terminals – Optimization of Investment Situation: Client requested evaluation of the capabilities of three critical terminals on a major pi... Read More
Gas Turbine H2 Fuel Firing Retrofit Study Situation: Becht was selected by a refining client to evaluate and qualify combustion hardware capa... Read More
Advanced Gas Turbine Qualification Situation: Becht was selected by a European Independent Power Producer (IPP) to assess the technical... Read More
Coker Optimization Becht leverages RealWear, Inc. collaboration technology to assist with an InfraRed Thermography scan... Read More