Elastic Follow-up Can Result in Failures in Systems that Comply with Piping Code Rules
The analysis procedures in the Code essentially assume that the strain range in the system can be determined from an elastic analysis. That is, strains are proportional to elastically calculated stresses. The stress range is limited to less than two times the yield stress, in part to achieve this. However, in some systems, strain concentration […]