News & Insights

The Becht Blog

In this section of the site contributing authors submit interesting articles relating
to the various services, industries and research & development efforts of Becht.

News & Blog

Repair of Pressure Equipment and Piping in Nuclear Power Plants- Navigating ASME XI Repairs with PCC-2 as a Roadmap

Download/View as PDF Summary – This article assists engineers in selecting ASME XI options for the repair of ASME III nuclear components. In summary, the repair options in ASME XI are dispersed throughout Section XI and Code Cases, while, in contrast, the ASME PCC-2 repair standard (for non-safety related components) lists repair options in a […]

Continue Reading

Loads on Buried Pipe: A 100-Year Old Empirical Formula Still Holds Water

The evaluation of the effects of surcharge loads on buried pipes can be addressed using the Iowa formula. This formula, over 100 years old, matches the results of state-of-the-art finite element analysis with pipe-soil interaction. In 1913, Iowa State University professors Marston and Anderson published the results of their experimental work on the resistance of […]

Continue Reading

Bob Sims Elected To Board of AAES

The American Association of Engineering Societies (AAES) Board of Directors Nov, 3, 2016 elected J. Robert Sims, 2014-2015 ASME President and Eminent Fellow at Becht Engineering Co., Inc., to the AAES Board of Directors for a three-year term, beginning January 1, 2017. The AAES is a multidisciplinary organization of engineering societies dedicated to advancing the knowledge, […]

Continue Reading

Piping Settlement Screening Tool

Settlement of a pipe support foundation is usually not a big deal to assess. A local piping flexibility model will reveal if the settled support keeps the pipe bending stresses within the allowable codes and, if the bending stresses are unacceptable, modifying the support and monitor periodically for further settlement is normally a quite manageable […]

Continue Reading

Storage Tanks – Maintenance & Reliability of Floating Roofs

The safe operation, maintenance and reliability of roofs in large tanks, does require special considerations in their design, construction and installation practices. Over the past 60 plus years, thousands of tanks with Fixed Roofs with internal Covers, and Floating Roofs, have been used to store Crude Oil and Middle Distillates. Refiners derived significant advantage through […]

Continue Reading

Risk Based Work Selection (RBWS) – An Essential Step for Turnaround Work Scope Optimization in Refining Units

Turnarounds (TA) in refining units are executed periodically, on a planned basis, to meet multiple objectives, such as regulatory compliance, process reliability improvement, and equipment inspection and/or repairs. In a competitive business environment, managing TA events in a cost effective manner is a well-recognized challenge. Key Step – Planning Development of a comprehensive Work Scope for […]

Continue Reading

Your pump’s Mean Time Between Repairs (MTBR) is what?…Or what should it be…

Many of the tourist spots around the world have panhandlers. Some of the more creative ones stand on street corners advertising that they will tell you where you got your shoes, for a dollar. Of course it turns out that “you got your shoes” at the corner of Bourbon and St. Peters – or wherever […]

Continue Reading

Importance of Codes and Standards for Process Safety

Compliance with the Process Safety Management rule, OSHA 1910.119, is a requirement for plants processing certain highly hazardous materials exceeding threshold quantities. The rule requires the owner to demonstrate all equipment has been purchased and installed in accordance with recognized industry standards. Maintenance practices must also be according to Recognized and Generally Accepted Good Engineering […]

Continue Reading

Environmentally-Assisted Fatigue (EAF) in Nuclear Power Plants

Before we tackle environmentally-assisted fatigue (EAF), what is fatigue? In ASME Boiler & Pressure Vessel Section III Division 1, Subsection NB (in short, ASME III NB) fatigue refers to the damage caused by systems and components as a result of cyclic loads. The qualification of the primary coolant system of light water reactors (ASME III […]

Continue Reading

Equipment Nozzle Loads

by Greg Hollinger and George Antaki One of the qualification requirements for a piping system is to keep the loads imparted by the piping on equipment nozzles within certain allowable limits. These loads consist of sets of three forces and three moments, for the various load combinations. There are basically two types of nozzle load limits: […]

Continue Reading
1 34 35 36 48
Let Becht Turn Your Problem
Into Peace of Mind