News & Insights

The Becht Blog

In this section of the site contributing authors submit interesting articles relating
to the various services, industries and research & development efforts of Becht.

News & Blog

Roadmap For Repair of Buried Pipe

The repair of a corroded, damaged, or leaking buried pipe should be approached in a well-structured manner. Here is a roadmap to the repair options for buried steel pipes, with the corresponding brief commentary. 1. Open trench repair 1.1 New line, replacing the existing line (or segment). Determine whether to use the same material, or […]

Continue Reading

Eight Pillars Of Excellent FEMI Programs

INTRODUCTION A refinery or chemical plant Fixed Equipment Mechanical Integrity (FEMI) program consists of eight basic categories or “Pillars” that are fundamental to achieve FEMI excellence. While every refinery or chemical plant has some form of these Pillars in place, they are often inadequately implemented or have significant gaps in the key elements that make […]

Continue Reading

Cost, Schedule, Quality – Pick Two … Isn’t Always True

– Achieving Excellence in Any Project –  The old saying in managing projects was Cost, Schedule and Quality. Pick two. This is because it is very difficult to do a good job on all three of these critical aspects of any project. If we highly control cost, the quality of the finished project may suffer. […]

Continue Reading

Joe Collins Interviews With Crane Hot Line

This month, Joe Collins is featured in Crane Hot Line’s Executive Spotlight. Joe talked with editor-in-chief Mike Larson about his (Collins’) career and some of the issues facing the industry. In the aricle, Joe touches on his role and responsibilities with Becht Engineering, his career highlights including management of a 300-crane fleet at Zachry and […]

Continue Reading

Steps to Increase Efficiency, Improve Deliverables and Reduce Expert Witness Costs

OR – Keeping Your Expert Witness Sane –  Litigation is extraordinarily expensive. Legal and expert witness fees can quickly mount up and become a significant percentage of the amount in dispute. I worked on a cost dispute on a plant estimated to cost $68MM but was significantly over expended. The litigation and expert fees were […]

Continue Reading

When Should the Rules for Severe Cyclic Conditions (Service) in ASME B31.3 Be Used?

This posting (November 2019) is an update to an October 2013 post which reflects changes to the ASME B31.3 Code relative to severe cyclic service that have occurred since the original post. There has been a fair amount of confusion as to when the rules for severe cyclic conditions in ASME B31.3 should be used, […]

Continue Reading

How to Resolve an Engineering Manager’s Typical Dilemma – “Where to Start”

The Problem Too often, the inability to get the required work done correctly, and on-time, has been blamed on too few people, not enough of the right people, or situations that were not anticipated.  Dr. Louis T. Rader’s comments, about engineering management, are still applicable to many managers today.  In 1964, he noted that: “The […]

Continue Reading

A Love Hate Relationship with Turnarounds (FMEA for Critical Path)

I LOVE Turnarounds!  The excitement – The planning – The organizationOne major focus with a million minor tasks that consume you for at least 12 hours a day (or night) As in the movie “Apocalypse Now” with Robert Duval as Lieutenant Colonel Kilgore, delivers the classic line “I love the smell of napalm in the morning,” […]

Continue Reading

Joe Collins Presents at Rice Global E&C September Roundtable

On Friday September 13th, Becht’s Heavy Lift and Heavy Haul Subject Matter Expert Joe Collins will be presenting “A Lift Plan for Every Lift” at the Rice Global E&C Forum’s September Roundtable. Below is an excerpt of Mr. Collins’ presentation: “When attempting any lift, regardless of how small or seemingly insignificant, there is a minimum […]

Continue Reading
1 25 26 27 48
Let Becht Turn Your Problem
Into Peace of Mind