News & Insights

The Becht Blog

In this section of the site contributing authors submit interesting articles relating
to the various services, industries and research & development efforts of Becht.

News & Blog

Evolution of Pipe Stress Equations in the ASME Nuclear Codes (and where we are today)

The Pre-1955 Era Until 1955, the ASME Boiler and Pressure Vessel Codes, and the ASME B31 Pressure Piping code provided rules of good design practice with quantitative criteria for pressure design.  For example, quoting from ASME VIII Rules for the Construction of Unfired Pressure Vessels Section VIII A. S. M. E. Boiler Construction Code, 1927: […]

Continue Reading

Improvements and Upcoming Updates to BechtFFS Software

Below is a listing of recent enhancements to the BechtFFS software, designed to improve the software’s capabilities as well as user experience. In the brittle fracture module, for B31.3 process piping, the user has the option of using the stress basis (Eqn 3.3 in API 579-1/ASME FFS-1) for the longitudinal stresses. Implemented MAWP and minimum […]

Continue Reading

Capacity Reduction of a Compression Member with an Initial Deformation

A recent review of equipment installed in a power plant found a piping strut that was visibly bent. Would the bend in the strut reduce its load bearing capacity as a compression member? The answer is YES!  The load bearing capacity of a bent strut against buckling is reduced. The reduction in buckling capacity is […]

Continue Reading

Process Safety Management and YOU

Walking the Walk…Management Commitment My assumption is if you are reading this, you have some involvement in, or responsibility for, Process Safety Management (PSM) in your facility.  OSHA’s Standard for Hazardous Materials, 29 CFR 1910.119, is a mere 21 pages long including 12 pages of “non-mandatory” appendices — but should it be your responsibility, what […]

Continue Reading

Making Bad Actor Elimination Programs Work

This is the first in a series of Blogs on improving plant reliability programs through improvements in culture, programs and equipment performance.  This Blog focuses on Bad Actor Elimination. The second part in this series is titled Reliability Beliefs – Driving Organizational Accountability (click) Most plants have many pieces of equipment that are chronic problems.  […]

Continue Reading

Due Diligence – Front End Loading for Plant Acquisitions

In many cases operating companies and financial institutions utilize Due Diligence studies for critical input on “Go/No Go” decisions for plant acquisitions.  Once the decision is made to purchase the plant, the Due Diligence study is often put on the shelf.  The company purchasing the new asset then faces significant challenges integrating the asset into […]

Continue Reading

Evaluation of Corroded Pipe in Accordance with ASME B&PV Code Section XI – A Comparison of the Three Code Cases

The evaluation of wall thinning corrosion in steel pipes is addressed in three ASME XI code cases: N-513, N-597, and N-806. I have no ambition here other than to summarize in a table the differences between these three code cases. A brief commentary follows the table. The brief commentary… Line A – While these are […]

Continue Reading

Fitness-For-Service API 579-1/ASME FFS-1: Substantive Changes to the 2016 Edition

Contributing Authors: Eileen Chant, Greg Epremian, Ranjan Nadarajah, Mark Stonehouse  Summarized herein are the substantial changes to API 579-1/ASME FFS-1, Fitness for Service, that were incorporated in the 2016 edition, as reviewed by Becht Fitness for Service experts. API 579-1/ASME FFS-1 is a Standard jointly published by API and ASME.  The purpose of the document […]

Continue Reading

ASME III Appendix F – A Valuable Guide to the Operability Assessment of Piping Systems

The NRC Inspection Manual Chapter 0326 refers to ASME III Appendix F as an acceptable method for the evaluation of “a degradation or nonconformance associated with piping or pipe supports …”. Appendix F provides five alternative methods for the qualification of pressure equipment, piping, and their supports. They are: (1) elastic analysis, (2) plastic analysis, (3) limit collapse analysis, […]

Continue Reading

Repair of Pressure Equipment and Piping in Nuclear Power Plants- Navigating ASME XI Repairs with PCC-2 as a Roadmap

Download/View as PDF Summary – This article assists engineers in selecting ASME XI options for the repair of ASME III nuclear components. In summary, the repair options in ASME XI are dispersed throughout Section XI and Code Cases, while, in contrast, the ASME PCC-2 repair standard (for non-safety related components) lists repair options in a […]

Continue Reading
1 32 33 34 47
Let Becht Turn Your Problem
Into Peace of Mind