News & Insights

The Becht Blog

In this section of the site contributing authors submit interesting articles relating
to the various services, industries and research & development efforts of Becht.

News & Blog

Why Best Practices Don’t Always Lead to High Reliability

There are numerous standards, recommended practices, and guidelines which provide clear direction on how to manage equipment integrity. By now, many petrochemical operators have implemented Risk-Based Inspection (RBI), Reliability Centered Maintenance (RCM), and Root Cause Analyses (RCA). All these risk management controls, as well as many others, are critical: Equipment, which is well designed to […]

Continue Reading

Going Beyond Compliance: How Refineries Can Reduce GHG Emissions and Stay Competitive in a Low-Carbon Future

With contributing author Jessica Hofmann The oil and gas industry alone, directly and indirectly, contributes to 42 per cent of global emissions. As a result, refineries worldwide, as part of the wider O&G value chain, are facing increasing pressure to reduce their greenhouse gas (GHG) emissions and align with climate-change goals set by regulators. Refineries […]

Continue Reading

Evaluating Purchased Feedstocks for Hydrocrackers and Hydrotreaters

I had multiple requests to discuss how to evaluate purchased feedstocks for hydroprocessing units.  As always, I’ll present some ideas and welcome further comments and thoughts. Jack be nimble, Jack be quick! In my background, the question of whether to purchase a feedstock for a hydroprocessing unit comes up with very little notice and sometimes […]

Continue Reading

Properties of Castable Refractories

Refractory linings are common throughout the refinery and found in many different units including the FCCU, fired heaters, and Claus thermal reactors. In the previous posting of Becht Blogs: Refractory series, we gave a cursory overview of several refractory types and where they are typically applied (Introduction to Refractory). These materials come from the family […]

Continue Reading

Revalidation, Reassessment, Evergreening, Updating…What the heck am I supposed to do with my RBI program?

As owner-users continue to rely on existing RBI programs, the question of how to keep an RBI program functioning and compliant continually comes up in discussions.  Mechanical integrity professional want to know what needs to be done and when it needs to happen.  Let’s start with Code requirements: API 510 10th Edition, 2nd Addendum 6.3.2 […]

Continue Reading

Hydroprocessing Relief Issues: Chapter 3 – Vapor and Liquid Blow-Through to Distillation

This is the third of 3 articles discussing relief issues for Hydroprocessing Units. Last month we discussed Separator Blow-through. As discussed, the five main lessons from that article are: Relief valves on low-pressure separators must be designed for vapor blow-through The design vapor blow-through rate must consider all potentially open level-control valves and bypass valves […]

Continue Reading

Integrity Operating Windows Anchor an RBI Program

Risk-based inspection (RBI) methods have been around the refining and petrochemical industry for nearly 3 decades.  The concept of focusing inspection programs on areas of highest risk has proven to be an effective approach for managing fixed equipment integrity and optimizing inspection programs.  For RBI, risk is defined as the product of probability of failure […]

Continue Reading
1 6 7 8 48
Let Becht Turn Your Problem
Into Peace of Mind